Industrial Electrical Works at factory;• Supply and install Motor Control panels and starters• Supply and lay MICC cables for motors• Supply and lay PVC/ SWA/ PVC cable for motors• Upgrade motor switchboard |
Berger Paint (M) Sdn. Bhd. Bukit Raja, Klang. |
Usrah Electric & ServicesKadir Consult, Subang Jaya |
93 K |
1990 |
| 2. |
Electrical and Telecom works at Main Campus, MYPM, Bangi.1. Internal Works:• Upgrade the main switchboard• Supply and install sub-switchboard and distributor board• Supply and install electrical fittings for all buildings2. External Works:• Supply and lay submain cabling PVC/ SWA/ PVC from main-switch board and sub-switchboard• Supply and install compound lighting / street lighting• Telecom work ; to lay telecom ducting and JC/ 92 man-holes |
Yayasan Pelajaran MARA |
YPM Realties Sdn. Bhd., Jalan Raja Laut, Kuala Lumpur / RMZ Jurutera Perunding. |
610 K |
1992 |
| 3. |
Wiring work for the Mosque, Masjid Jamek :-1. Internal: • Wiring the whole building• Supply and install various types of fittings2. External: • Supply and lay submain cabling PVC/ SWA/ PVC from main-switch board and subswitchboard• Supply and install compound lighting / street lighting |
International Islamic University, Petaling Jaya |
YPM Realties Sdn. Bhd., Jalan Raja Laut, K. Lumpur / |
60.5 K |
1992 |
| No. |
Job Details
|
Clients
|
Main Contractor / Consultant |
Amount (RM), K=Thousand, M=Million |
Date of Completion |
| 4. |
Electrical and telecom work at Klinik Kakitangan dan Ibu Mengandung, Batu 2 ½, Jalan Cheras, Kuala Lumpur :-1. Internal Works:• Upgrade the main switchboard• Electrical wiring work in the building• Supply and install sub-switchboard and distribution board• Supply and install electrical fittings for all buildings• Supply and install computerized digital calling system2. External Works:• Supply and lay underground cables using PILC copper cable• Telecom work – to lay telecom ducting and JC/ 9C man holes |
Dewan Bandaraya Kuala Lumpur |
YPM Realties Sdn. Bhd., Jalan Raja Laut, Kuala LumpurDBKL |
160 K |
1992 |
| 5. |
Electrical and telecom, air cond, fire fighting and lightning protection works at the additional Campus, MARA Junior College, Jalan Gambang, Kuantan, Pahang:1. Internal Works:• Electrical wiring work in the building• Supply and install sub-switchboard and distributor board• Supply and install electrical fittings for all buildings• Supply and install lightning protection system2. External Works:• Supply and lay submain cables using PVC / SWA/PVC from MSB to SSB• Telecom work – To lay telecom ducting and JC/9C man-holes and JB30 |
Yayasan Pelajaran MARA |
YPM Realties Sdn. Bhd., Jalan Raja Laut, K. Lumpur/Jurutera Perunding ZAABA |
180 K |
1993 |
| No. |
Job Details
|
Clients |
Main Contractor / Consultant |
Amount (RM), K=Thousand, M=Million |
Date of Completion |
| 6. |
Wiring works for housing projects at Taman Johan Setia, Jalan Banting, Klang |
Sasapadu Construction Sdn. Bhd. |
Sasapadu Construction Sdn Bhd |
200 K |
1994 |
| 7. |
Wiring works for 176 unit Semi detached house for estate managers/ workers at ading Guthrie SUA BETONG and SELIAU, Port Dickson. |
Guthrie Malaysia Berhad |
Guthrie Malaysia Bhd |
116 K |
1994 |
| 8. |
Electrical and Telecom, aircond, fire fighting and lightning protection works at the hostel and administration building for Wisma Yayasan Basmi Kemiskinan, Serendah, Hulu Selangor:-1. Internal Works:• Electrical wiring work in the building• Telephone wiring work in the building• Supply and install telephone / keyphones• Supply and install air conditioning system• Supply and install sub-switchboard and distr. Board• Supply and install electrical fittings for all buildings• Supply and install lightning protection system2. External Works:• Supply and lay submain cables using PVC/ SWA/ PVC from MSB to SSB• Telecom work – To lay telecom ducting and JC/9C man-holes and JB30• Telecom work – To lay telecom ducting and JC/9C man-holes |
Yayasan Basmi Kemiskinan, Government of Selangor |
Rosalia Holding Sdn BhdIMAAR Architect, Kuala LumpurYHS Consultant Sdn Bhd |
198 K |
1994 |
| No. |
Job Details
|
Clients |
Main Contractor / Consultant |
Amount (RM), K=Thousand, M=Million |
Date of Completion |
| 9. |
350MW Gas Turbine Project Package A, Serdang, Selangor.1. Internal Works (Low Voltage Side):• Electrical wiring work in the building• Electrical wiring work in the Gas Turbine Hall (high building)• Wiring MICC cable on tray• Supply and install DBs• Supply and install electrical fittings for a buildings• Supply and install lightning protection system2. External Works:• Supply and lay submain cables using PVC/ SWA/ PVC from MSB to SSB• Supply and install street lighting column and lay submain cables using PVC/ SWA/ PVC |
Tenaga Nasional Berhad |
Projass & Clough Joint-VentureTNB |
950 K |
1994 |
| 10. |
Electrical maintenance works for 33 schools in Gombak District.1. Internal Works:• Electrical rewiring work in the school buildings• Supply and install electrical fittings for all buildings• Supply and install electrical distribution fuse board• Troubleshooting, rectifying and repairing electrical faulty in the school building2. External Works:• Supply and lay PVC / SWA / PVC for pump house. |
Public Work Department, Government of Malaysia |
Projass Engineering Sdn. Bhd. / Jabatan Kerja Raya |
350 K |
1995 |
| No. |
Job Details
|
Clients |
Main Contractor / Consultant |
Amount (RM), K=Thousand, M=Million |
Date of Completion |
| 11. |
External wiring / cabling works to EMARTEL cabin for 16 sites in the Klang Valley. |
MRCB Communication Sdn. Bhd. |
MRCB Communication Sdn BhdAI & Associates, Taman Melawati, Kuala Lumpur |
125.5 K |
1995 |
| 12. |
Electrical wiring work for office renovation at AMODA building, Jalan Bukit Bintang, Kuala Lumpur. |
AT & T (M) Sdn. Bhd. |
Akidesign Sdn. Bhd. |
65 K |
September 1995 |
| 13. |
External wiring / cabling works to EMARTEL cabin for 06 sites at Senawang and Kuala Lumpur areas. |
MRCB Communication Sdn. Bhd. |
MRCB Communication Sdn BhdAI & Associates, Taman Melawati, Kuala Lumpur. |
110.5 K |
January 1996 – May 1996 |
| 14. |
Electrical wiring for new main office building at Taman Melawati, Kuala Lumpur. |
AI & Associates Sdn. Bhd. |
Usrahlite Engineering (M) Sdn. Bhd. |
68.5 K |
July 1996 |
| 15. |
M & E work for Sapura PCN System at Rantau, Negeri Sembilan and Pengkalan Chepa, Kota Bharu, Kelantan Darul Naim. |
Uniphone Usahasama Sdn. Bhd. |
Usrahlite Engineering (M) Sdn. Bhd. |
82.6 K |
August 1996 |
| 16. |
Electrical wiring work for Cadangan Pembinaan Infrastruktur Fasilitas bagi MIG 29 dan F/A – 18D at TUDM Butterworth, Pualu Pinang, (Pakej II) for Kementerian Pertahanan Malaysia. |
Kementerian Pertahanan Malaysia. |
Ibsul Holdings Sdn. Bhd. /Ilham Consultant Sdn. Bhd. |
1.53 M |
October 1996 – October 1997 |
| 17. |
Electrical wiring work for Pusat Pakar Sains Sdn. Bhd.. Batu 13, Puchong, Selangor Darul Ehsan. |
Pakar Sains Sdn. Bhd. |
Intext Design Sdn. Bhd. |
120.5 K |
November 1997 – January 1998 |
| No. |
Job Details
|
Clients |
Main Contractor / Consultant |
Amount (RM), K=Thousand, M=Million |
Date of Completion |
| 18. |
Electrical installation at Shah Alam and Kuala Langat factories for M/S ARA BORGSTENA Sdn. Bhd. |
Ara Borgstena Sdn. Bhd. |
Cybotics Corporation Sdn. Bhd. |
220 K |
June 1998 – July 1998 |
| 19. |
Electrical wiring and installation work for Proposed Sewerage System for Putrajaya project. Phase 1 A. |
Putrajaya Holdings Sdn. Bhd. |
Pembinaan Jayabumi (Sarawak) Sdn Bhd /WABAG Water Engineering Pte. Ltd. /Saff Consultant Sdn. Bhd. |
2.7 M |
November 1997 – March 1999 |
| 20. |
Electrical wiring work for Cadangan Membina Bangunan Pejabat dan Kedai Telekom di atas Lot 11724 (PTD 12902) dan Lot 41451 (PTD 71206) Mukim Plentong, Johor Bahru, Johor Darul Takzim. |
Syarikat Telekom Malaysia Berhad |
Ibsul Holdings Sdn. Bhd. / Telekom Malaysia Berhad |
1.86 M |
April 1998 – November 1999 |
| 21. |
Electrical installation work for Cadangan Membina dan Menyiapkan Institut Kemahiran Belia Negara (IKBN) Baru, di Lot 4256, Pagoh, Muar, Johor Darul Takzim. |
Kementerian Belia dan Sukan, Malaysia. |
Mega Nine Sdn. Bhd. / Sigma Jelas Engineers Sdn. Bhd. |
7.3 M |
June 2000 – October 2001 |
| 22. |
Electrical installation work for Satu (1) Blok Empat (4) Tingkat, Tiga (3) Blok Tiga (3) Tingkat dan sebuah Kantin di Sek. Men. Jati. Kinta, Perak Darul Ridzuan. |
Kementerian Pendidikan Malaysia |
Indkom Elektrik Sdn Bhd / Jabatan Kerja Raya, Perak |
200K |